WASTEWATER

Revision VOP Sanitary Sewer Study 04-12-2023 updated 4.24.23

NEW Peninsula Wastewater Letter CVNP 4.10.2023

NEW EPA letter to Peninsula March 2023

Council’s Letter to Residents on Wastewater 2.6.2023 

EPA Letter-Peninsula WastewaterTreatment Options 6.2022

Sanitary Sewer Study Overview Report –below in 4 Parts 

  1. Sanitary Sewer Study Overview pgs 1-6
  2. Maps Figures 1-5
  3. Maps Figures 6-10
  4. Figures 11-13 & Cost Chart

JUNE 1, 2020 WASTEWATER COMMITTEE DRAFT MEETING MINUTES

APRIL 23, 2020 WASTEWATER COMMITTEE MEETING MINUTES

Peninsula PowerPoint Final 2

Peninsula Waste Water PowerPoint Final

JUNE 1 2020 WASTEWATER COMMITTEE MEETING AGENDA

APRIL 23 2020 WASETWATER COMMITTEE MEETING DRAFT MINUTES

April 23, 2020 Wastewater Committee Meeting Notice and Agenda

March 10, 2020 WASTEWATER COMMITTEE MEETING MINUTES

FEBRUARY 25 2020 WASTEWATER COMMITTEE MEETING MINUTES

MARCH 10 2020 WASTEWATER COMMITTEE MEETING AGENDA

February 25, 2020 WASTEWATER COMMITTEE MEETING MINUTES

VILLAGE OF PENINSULA SEMI-PUBLIC SEWAGE TREATMENT SYSTEM INSPECTION CERTIFICATE

VILLAGE OF PENINSULA PROPERTY OWNERS SUMMIT COUNTY HOUSEHOLD SEWAGE TREATMENT SYSTEM MATCHING FORGIVABLE LOAN PROGRAM

Wastewater Preliminary Engineering Report 2017-11-10

LETTER TO THE PROPERTY OWNERS OF THE VILLAGE OF PENINSULA WASTEWATER SERVICE DISTRICT

SUMMIT COUNTY PUBLIC HEALTH PENINSULA STORMWATER SAMPLING DATA NOVEMBER 30 2018

Below is a link to the Wastewater District as of 2018-01-22

Wastewater District Map

MARK YOUR CALENDAR!

Wastewater Project Update and Public Input

Wednesday April 11, 2018 from 6:00pm – 8:00pm.  Boston Township Hall

We are now almost 3 months into the Design Engineering.  Please join us Wednesday, April 11, from 6-8pm, at the Boston Township Hall for a session with Stantec Consulting, who will be updating the Village on our wastewater project.  Stantec will also provide an overview of the preliminary collection system layout and discuss how your property will tie into the main collection line.   Stantec consultants, Gary Silcott and Dale Kocarek, will be on hand to talk with you individually to gather information on your current basement depth and sewage outtake pipe location.  So if you are inclined, mosey down to your cellar before the session, measure your basement height and note at what level your sewage pipe exits the building.  This information will be helpful to verify the preliminary estimated depth levels of the main collection pipes.  This program is for those that live in the Wastewater Service District, or own property within the District, as Stantec will be discussing specifics of your property’s connection to the main line.  But all are welcome!

NEW!  – FAQs

Click here for some Frequently Asked Questions – and more importantly, answers!

Planning Commission’s Wastewater Advisory Committee has completed their first Findings and Recommendations report.
Wastewater Advisory Committee Report 2-29-16 with Opening Remarks

Wastewater Agenda-August 4, 2016

Wastewater Agenda-November 16 2015

Wastewater Agenda-November 2 2015

SEPTEMBER 28, 2015 MINUTES
Wastewater Agenda-Sept 28 2015

Wastewater Agenda-Sept 14 2015

AUGUST 31, 2015 MINUTES
Wastewater Agenda-Aug 31 2015

Wastewater Agenda-Aug 24 2015

AUGUST 10, 2015 MINUTES
Wastewater Agenda-Aug 10 2015

JULY 27, 2015 MINUTES
Wastewater Agenda-July 27 2015

JULY 13, 2015 MINUTES
Wastewater Agenda-July 13 2015

JUNE 29, 2015 MINUTES
Wastewater Agenda-June 29 2015

JUNE 15, 2015 MINUTES
Wastewater Agenda-June 15 2015